• Barge Group install MUGA as part of regeneration project ...

Barge Group install MUGA as part of regeneration project ...


A pupil referral unit was desperate to regenerate an area on site that had become unsuable and make good use of all their available space. Stage 1 involved clearing overgrown woodland vegetation and felling trees. Wood cladding was then added too existing site fencing to increase safe guarding and finally 75% of the area was turfed with real grass. 

Stage 2 saw the installation of a Multi Use Games Area (MUGA) in the remaining 25% of the newly cleared space. This second stage required ground works, grading, fence and artificial grass installation and sports line marking. The modular base system, made from recycled plastic, clipped together in super quick time and created a solid, self draining, stable base perfect this active area. All services required were carried out by Barge Group. The same company, the same project manager, from start to finish.

Contact us with your regeneration enquiries and let us help you make good use of all of your available outdoor space. The possibilities are endless! 

Get in touch...

If you have any questions or an enquiry please don't hesitate to get in contact.

Bexley Awards Dartford School Games Logos

Contact Us

N13 Europa Trading Estate,
Fraser Road Erith, Kent, DA8 1QL

This email address is being protected from spambots. You need JavaScript enabled to view it.

01322 311141

Twitter